tofu press machine
1.Automatic temperature control
2.Easy and convenient
3.Clean and health
tofu press machine
1.Automatic temperature control
2.Easy and convenient
3.Clean and health
Automatic temperature control tofu press machine
1.Automatic operation:
The machine takes full automatic control system and can works automatically thus release worker from hard work.
2.Automatic temperature control
The machine has temperature controller to monitor the process of soymilk boiling.
It can set the temperature for different products.
Finally, it can alarm when it reach the setted temperature.
3.Easy and convenient
The machine release the serum automatically. The brine barrel is mobile and flexible.
It takes 15-20 minutes for the soaked beans to become Tofu.
4. Clean and health
Being made of 304 stainless steel, the whole equipment is easy to clean and is health for eating.
5. Maximize the keeping of original flavor and nutrition
Heating the serum with ultra-high temperature steam generated by electric in close system, it can make the temperature up to 100 degrees Celcius and kill the harmful materials in the serum. Meanwhile the high temperature removes the odor of the beans and keeps the original flavor, color, proteins and nutrition.
6. High yield rate
The yield rate is 30% higher than other equipments in the market.
7. Straight deal
You can sell while making. The customers will be happy to see how the Tofu was made.
8. Energy saving
The machine can save 25% energy compared with the open type boiler.
Parameters:
GL-60
(Single box)
|
1.65×0.6×1.2
|
220V/380V |
750W |
6KW |
9KW |
30 |
GL-100A
(Double boxes)
|
0.9×0.75×1.3 |
1.0×0.9×1.3 |
220V/380V |
750W |
6KW |
9KW |
50 |
GL-100B
(Double boxes)
|
0.9×0.65×1.3 |
1.1×0.95×1.3 |
220V/380V |
750W |
6KW |
9KW |
50 |
GL-200A
(Double boxes)
|
1.6×0.65×1.3 |
1.3×0.9×1.3 |
220V/380V |
750W |
6KW |
9KW |
100 |
GL-200B
(Double boxes)
|
1.6×0.75×1.3 |
1.3×0.95×1.1 |
220V/380V |
750W |
6KW |
9KW |
100 |
GL-300A
(Double boxes)
|
1.95×0.65×1.3 |
1.1×0.95×1.3 |
220V/380V |
750W |
6KW |
9KW |
150 |
Main pictures:
Remarks:
Ⅰ.Delivery time: 15 days after receiving the whole payment.
Ⅱ.Payment term: 50% as prepayment by T/T, the balance 50% should be effected after seeing the faxed copy of B/L by T/T.
III. Valid time : This quotation is valid for one month.
IV .Quality Guarantee Terms:
Quality guarantee term is for one year . Malfunctions which are caused by machine-self and quality will be responsible for our manufacturer. Other malfunctions which are caused by operation mistakes, man-made problems, etc will be responsible for clients-self.